Construction of The Padma Multipurpose Bridge
The bridge is considered to be the most challenging construction project in the history of Bangladesh, the steel truss bridge carries a four-lane highway on the upper level and a single-track railway on the lower level. The bridge consists of 41 sections, each 150.12 m (492.5 ft) long and 22 metres (72 ft) wide,